| Assessment Year | 2017 |
|---|---|
| Principal Product | Plastic Cutlery and Straws |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
126,000
ft2
|
| Annual Production | 1,000,000,000
pieces
|
| Production Hrs. Annual | 8,640
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $452,970 | 9,607,512 |
kWh
|
$0.047 | |
| Electricity Demand | $115,435 | 16,605 |
kW-mo/yr
|
$6.95 | |
| Electricity Fees | $6,184 | - |
|
- | |
| Natural Gas | $6,096 | 901 |
MMBtu
|
$6.77 | |
| Waste Disposal Costs | |||||
| Water Usage | $16,765 | 5,177 |
Tgal
|
$3.24 | |
| Water Disposal | $9,527 | 5,177 |
Tgal
|
$1.84 | |
| Other Liquid (haz) | $98,890 | 2,747 |
gal
|
$36.00 | |
| TOTAL YEARLY COSTS | $705,867 | ||||
| RECOMMENDED SAVINGS* | $263,015 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Other Liquid (haz) Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $181 | $74 |
$25
539
kWh
|
- |
$156
-
MMBtu
|
- | - | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $172 | $60 |
$137
2,902
kWh
|
$35
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.4224: Upgrade controls on compressors | $4,908 | $2,820 |
$4,074
86,400
kWh
|
$834
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 3.4151: Minimize water usage | $1,019 | $585 | - | - |
$385
-
MMBtu
|
$404
-
Tgal
|
$230
-
Tgal
|
- | |
| 05 | 2.7135: Install occupancy sensors | $133 | $78 |
$133
2,830
kWh
|
- | - | - | - | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,369 | $1,489 |
$1,862
39,501
kWh
|
$507
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.7251: Reduce air conditioning load by evaporating water from roof | $29,041 | $79,703 |
$29,299
621,406
kWh
|
- | - |
$(-258.0)
-
Tgal
|
- | - | |
| 08 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $222,139 | $1,220,494 |
$123,249
2,613,984
kWh
|
- | - | - | - |
$98,890
-
gal
|
|
| 09 | 2.4221: Install compressor air intakes in coolest locations | $1,633 | $246 |
$1,355
28,739
kWh
|
$278
-
kW-mo/yr
|
- | - | - | - | |
| 10 | 2.2437: Recover waste heat from equipment | $1,420 | $4,153 |
$(-358.0)
(-7,538)
kWh
|
- |
$1,778
-
MMBtu
|
- | - | - | |
| TOTAL RECOMMENDED | $263,015 | $1,309,702 |
$159,776
3,388,763
kWh
|
$1,654
-
kW-mo/yr
|
$2,319
-
MMBtu
|
$146
-
Tgal
|
$230
-
Tgal
|
$98,890
-
gal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Other Liquid (haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs