Assessment Year | 1997 |
---|---|
Principal Product | Tanned hides |
NAICS |
n/a
|
SIC | 3111: Leather Tanning and Finishing |
Sales Range | $1 M to 5M |
# of Employees | 65 |
Plant Area |
44,800
ft2
|
Annual Production | 6,400,000
thousand feet
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $91,744 | 1,268,464 |
kWh
|
$0.072 |
Electricity Demand | $46,972 | 4,787 |
kW-mo/yr
|
$9.81 |
Electricity Fees | $4,787 | - |
|
- |
LPG | $4,540 | 856 |
MMBtu
|
$5.30 |
Fuel Oil #1 | $2,797 | 317 |
MMBtu
|
$8.82 |
Fuel Oil #2 | $964 | 120 |
MMBtu
|
$8.03 |
Fuel Oil #6 | $84,587 | 25,354 |
MMBtu
|
$3.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $84,680 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7229: Air condition only space necessary | $7,109 | $5,048 | - | - |
$7,109
-
MMBtu
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,055 | $9,772 |
$2,819
40,445
kWh
|
$1,236
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.2136: Install / repair insulation on steam lines | $2,357 | $1,200 | - | - |
$2,357
-
MMBtu
|
- | - | - | |
04 | 2.8123: Pay utility bills on time | $2,003 | - | - | - | - | - | $2,003 | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,367 | $1,246 |
$379
5,275
kWh
|
$1,059
-
kW-mo/yr
|
$(-71.0)
-
MMBtu
|
- | - | - | |
06 | 2.1113: Reduce combustion air flow to optimum | $1,739 | $400 | - | - |
$1,739
-
MMBtu
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $932 | $1,009 | - | - |
$932
-
MMBtu
|
- | - | - | |
08 | 2.8121: Apply for tax-free status for energy purchases | $723 | - | - | - | - | - | $723 | - | |
09 | 2.2511: Insulate bare equipment | $537 | $226 | - | - |
$537
-
MMBtu
|
- | - | - | |
10 | 2.2136: Install / repair insulation on steam lines | $499 | $378 | - | - |
$499
-
MMBtu
|
- | - | - | |
11 | 2.2511: Insulate bare equipment | $465 | $150 | - | - |
$465
-
MMBtu
|
- | - | - | |
12 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $60,813 | $30,000 | - | - | - | - | - | $60,813 | |
13 | 3.3131: Use evaporation to concentrate material | $2,081 | $2,400 | - | - | - |
$2,081
-
lb
|
- | - | |
TOTAL RECOMMENDED | $84,680 | $51,829 |
$3,198
45,720
kWh
|
$2,295
-
kW-mo/yr
|
$13,567
-
MMBtu
|
$2,081
-
lb
|
$2,726 | $60,813 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs