ITAC Assessment: ME0207
ITAC logo
ITAC Assessment: ME0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Tanned hides
NAICS
n/a
SIC 3111: Leather Tanning and Finishing
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area 44,800
ft2
Annual Production 6,400,000
thousand feet
Production Hrs. Annual 4,250
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,744 1,268,464
kWh
Electricity Demand $46,972 4,787
kW-mo/yr
Electricity Fees $4,787 -
LPG $4,540 856
MMBtu
Fuel Oil #1 $2,797 317
MMBtu
Fuel Oil #2 $964 120
MMBtu
Fuel Oil #6 $84,587 25,354
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Solid Waste (haz) Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7229: Air condition only space necessary $7,109 $5,048 - - $7,109
-
MMBtu
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,055 $9,772 $2,819
40,445
kWh
$1,236
-
kW-mo/yr
- - - -
03 2.2136: Install / repair insulation on steam lines $2,357 $1,200 - - $2,357
-
MMBtu
- - -
04 2.8123: Pay utility bills on time $2,003 - - - - - $2,003 -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,367 $1,246 $379
5,275
kWh
$1,059
-
kW-mo/yr
$(-71.0)
-
MMBtu
- - -
06 2.1113: Reduce combustion air flow to optimum $1,739 $400 - - $1,739
-
MMBtu
- - -
07 2.2511: Insulate bare equipment $932 $1,009 - - $932
-
MMBtu
- - -
08 2.8121: Apply for tax-free status for energy purchases $723 - - - - - $723 -
09 2.2511: Insulate bare equipment $537 $226 - - $537
-
MMBtu
- - -
10 2.2136: Install / repair insulation on steam lines $499 $378 - - $499
-
MMBtu
- - -
11 2.2511: Insulate bare equipment $465 $150 - - $465
-
MMBtu
- - -
12 3.2123: Convert to high volume low pressure (hvlp) paint guns $60,813 $30,000 - - - - - $60,813
13 3.3131: Use evaporation to concentrate material $2,081 $2,400 - - - $2,081
-
lb
- -
TOTAL RECOMMENDED $84,680 $51,829 $3,198
45,720
kWh
$2,295
-
kW-mo/yr
$13,567
-
MMBtu
$2,081
-
lb
$2,726 $60,813
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Solid Waste (haz) Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs