Assessment Year | 2016 |
---|---|
Principal Product | Composit Decking and Fencing Material |
NAICS | 321999: All Other Miscellaneous Wood Product Manufacturing |
SIC | 2499: Wood Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 67 |
Plant Area |
221,000
ft2
|
Annual Production | 60,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $685,030 | 14,651,093 |
kWh
|
$0.047 |
Electricity Demand | $218,769 | 39,879 |
kW-mo/yr
|
$5.49 |
Electricity Fees | $46,495 | - |
|
- |
Natural Gas | $106,803 | 15,279 |
MMBtu
|
$6.99 |
TOTAL YEARLY COSTS | $1,057,097 | |||
RECOMMENDED SAVINGS* | $48,694 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $8,075 | $353 |
$6,957
148,774
kWh
|
$1,118
-
kW-mo/yr
|
- | |
02 | 2.4224: Upgrade controls on compressors | $7,566 | $6,400 |
$7,407
158,400
kWh
|
$159
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,855 | $654 |
$1,597
34,184
kWh
|
$258
-
kW-mo/yr
|
- | |
04 | 2.4322: Use or replace with energy efficient substitutes | $1,615 | $4,480 |
$1,390
29,734
kWh
|
$225
-
kW-mo/yr
|
- | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $3,760 | $4,580 |
$3,760
80,417
kWh
|
- | - | |
06 | 2.6218: Turn off equipment when not in use | $5,303 | $1,200 |
$5,303
113,442
kWh
|
- | - | |
07 | 2.3212: Optimize plant power factor | $15,910 | $115,903 | - | - | $15,910 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,610 | $15,011 |
$3,968
84,866
kWh
|
$642
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $48,694 | $148,581 |
$30,382
649,817
kWh
|
$2,402
-
kW-mo/yr
|
$15,910 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs