Assessment Year | 2010 |
---|---|
Principal Product | electrical transformers |
NAICS | 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3677: Electronic Coils, Transformers, and Other Inductors |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
243,000
ft2
|
Annual Production | 350
pieces
|
Production Hrs. Annual | 7,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $559,054 | 7,770,492 |
kWh
|
$0.072 |
Electricity Demand | $22,446 | 12,975 |
kW-mo/yr
|
$1.73 |
Natural Gas | $143,895 | 26,947 |
MMBtu
|
$5.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $510,469 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $337,823 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7424: Shade windows from summer sun | $259,173 | $46,607 |
$249,980
3,571,154
kWh
|
$9,193
-
kW-mo/yr
|
- | |
02 | 2.7441: Replace broken windows and/or window sash | $145,366 | $500,000 |
$105,116
1,501,642
kWh
|
- |
$40,250
-
MMBtu
|
|
03 | 2.6125: Keep equipment clean | $5,750 | - | - | - |
$5,750
-
MMBtu
|
|
04 | 2.7441: Replace broken windows and/or window sash | $1,597 | $250 |
$1,597
22,822
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $1,212 | $2,410 |
$1,212
17,326
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,198 | $10,240 |
$15,198
202,675
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,315 | $9,660 |
$1,315
14,820
kWh
|
- | - | |
08 | 2.6218: Turn off equipment when not in use | $186 | $300 |
$186
2,662
kWh
|
- | - | |
09 | 2.6127: Maintain air filters by cleaning or replacement | $2,104 | $100 |
$2,019
28,847
kWh
|
$85
-
kW-mo/yr
|
- | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,259 | - |
$3,127
44,674
kWh
|
$132
-
kW-mo/yr
|
- | |
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,919 | $1,300 |
$6,630
94,720
kWh
|
$289
-
kW-mo/yr
|
- | |
12 | 2.6218: Turn off equipment when not in use | $3,016 | - |
$3,016
43,094
kWh
|
- | - | |
13 | 2.7224: Reduce space conditioning during non-working hours | $2,940 | - |
$2,940
42,000
kWh
|
- | - | |
14 | 2.7442: Keep doors and windows shut when not on use | $3,194 | $2,000 |
$3,194
45,644
kWh
|
- | - | |
15 | 2.2515: Use optimum thickness insulation | $11,828 | $5,000 |
$11,828
168,984
kWh
|
- | - | |
16 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $52 | $50 |
$52
754
kWh
|
- | - | |
17 | 2.7111: Reduce illumination to minimum necessary levels | $652 | - |
$558
7,980
kWh
|
$94
-
kW-mo/yr
|
- | |
18 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $12,000 | - | - |
$12,000
-
kW-mo/yr
|
- | |
19 | 2.7221: Lower temperature during the winter season and vice-versa | $19,660 | $18,000 |
$19,660
401,686
kWh
|
- | - | |
20 | 2.7232: Replace existing hvac unit with high efficiency model | $14,800 | $48,840 |
$14,800
211,428
kWh
|
- | - | |
21 | 2.2511: Insulate bare equipment | $248 | $300 | - | - |
$248
-
MMBtu
|
|
TOTAL RECOMMENDED | $510,469 | $645,057 |
$442,428
6,422,912
kWh
|
$21,793
-
kW-mo/yr
|
$46,248
-
MMBtu
|
||
TOTAL IMPLEMENTED | $337,823 | $91,217 |
$310,126
4,532,878
kWh
|
$21,699
-
kW-mo/yr
|
$5,998
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs