| Assessment Year | 2016 |
|---|---|
| Principal Product | Specialty Casting and Machining |
| NAICS | 331513: Steel Foundries (except Investment) |
| SIC | 3325: Steel Foundries, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 55 |
| Plant Area |
124,000
ft2
|
| Annual Production | 850
ton
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $98,206 | 2,088,767 |
kWh
|
$0.047 |
| Electricity Demand | $196,982 | 24,334 |
kW-mo/yr
|
$8.09 |
| Electricity Fees | $5,728 | - |
|
- |
| Natural Gas | $56,187 | 8,792 |
MMBtu
|
$6.39 |
| TOTAL YEARLY COSTS | $357,103 | |||
| RECOMMENDED SAVINGS* | $53,199 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $174 | $187 |
$174
3,694
kWh
|
- | - | - | |
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,270 | $8,259 |
$7,364
156,672
kWh
|
- |
$(-3,094.0)
-
MMBtu
|
- | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $415 | $162 |
$415
8,830
kWh
|
- | - | - | |
| 04 | 2.4322: Use or replace with energy efficient substitutes | $7,130 | $11,073 |
$3,787
80,568
kWh
|
$3,343
-
kW-mo/yr
|
- | - | |
| 05 | 4.625: Develop standard operating procedures | $22,270 | $4,336 | - | - | - | $22,270 | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,178 | $21,982 |
$3,827
81,432
kWh
|
$3,351
-
kW-mo/yr
|
- | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,671 | $827 |
$5,671
120,669
kWh
|
- | - | - | |
| 08 | 2.4224: Upgrade controls on compressors | $5,829 | $3,661 |
$2,267
48,239
kWh
|
$3,562
-
kW-mo/yr
|
- | - | |
| 09 | 2.6231: Utilize controls to operate equipment only when needed | $262 | $89 |
$262
5,580
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $53,199 | $50,576 |
$23,767
505,684
kWh
|
$10,256
-
kW-mo/yr
|
$(-3,094.0)
-
MMBtu
|
$22,270 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs