ITAC Assessment: BS0078
ITAC logo
ITAC Assessment: BS0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Specialty Casting and Machining
NAICS 331513: Steel Foundries (except Investment)
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 124,000
ft2
Annual Production 850
ton
Production Hrs. Annual 2,340
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,206 2,088,767
kWh
Electricity Demand $196,982 24,334
kW-mo/yr
Electricity Fees $5,728 -
Natural Gas $56,187 8,792
MMBtu
TOTAL YEARLY COSTS $357,103
RECOMMENDED SAVINGS* $53,199 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $174 $187 $174
3,694
kWh
- - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,270 $8,259 $7,364
156,672
kWh
- $(-3,094.0)
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $415 $162 $415
8,830
kWh
- - -
04 2.4322: Use or replace with energy efficient substitutes $7,130 $11,073 $3,787
80,568
kWh
$3,343
-
kW-mo/yr
- -
05 4.625: Develop standard operating procedures $22,270 $4,336 - - - $22,270
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,178 $21,982 $3,827
81,432
kWh
$3,351
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,671 $827 $5,671
120,669
kWh
- - -
08 2.4224: Upgrade controls on compressors $5,829 $3,661 $2,267
48,239
kWh
$3,562
-
kW-mo/yr
- -
09 2.6231: Utilize controls to operate equipment only when needed $262 $89 $262
5,580
kWh
- - -
TOTAL RECOMMENDED $53,199 $50,576 $23,767
505,684
kWh
$10,256
-
kW-mo/yr
$(-3,094.0)
-
MMBtu
$22,270
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs