Assessment Year | 2015 |
---|---|
Principal Product | bread and muffins |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
86,679
ft2
|
Annual Production | 70,000,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $552,779 | 5,947,277 |
kWh
|
$0.093 |
Electricity Demand | $310,391 | 11,480 |
kW-mo/yr
|
$27.04 |
Natural Gas | $362,933 | 53,424 |
MMBtu
|
$6.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $143,132 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $143,132 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,220 | $4,488 |
$7,083
76,198
kWh
|
$3,137
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.6231: Utilize controls to operate equipment only when needed | $5,421 | $3,541 |
$5,421
58,318
kWh
|
- | - | - | - | - | |
03 | 2.2121: Increase amount of condensate returned | $26,563 | $30,811 | - | - |
$14,293
-
MMBtu
|
- | - |
$12,270
-
Tgal
|
|
04 | 2.2414: Use waste heat from hot flue gases to preheat | $5,546 | $11,844 | - | - |
$5,546
-
MMBtu
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,206 | $17,797 |
$3,834
41,246
kWh
|
- | - | $598 | $(-226.0) | - | |
06 | 2.9114: Use solar heat to make electricty | $91,176 | $450,224 |
$52,052
559,997
kWh
|
$39,124
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $143,132 | $518,705 |
$68,390
735,759
kWh
|
$42,261
-
kW-mo/yr
|
$19,839
-
MMBtu
|
$598 | $(-226.0) |
$12,270
-
Tgal
|
||
TOTAL IMPLEMENTED | $143,132 | $518,705 |
$68,390
735,759
kWh
|
$42,261
-
kW-mo/yr
|
$19,839
-
MMBtu
|
$598 | $(-226.0) |
$12,270
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs