Assessment Year | 2014 |
---|---|
Principal Product | Cheese and Buttermilk |
NAICS | 311513: Cheese Manufacturing |
SIC | 2022: Natural, Processed, and Imitation Cheese |
Sales Range | $50 M to 100M |
# of Employees | 328 |
Plant Area |
61,045
ft2
|
Annual Production | 4,160
lb
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $50,396 | 776,720 |
kWh
|
$0.065 |
Electricity Demand | $16,100 | 2,739 |
kW-mo/yr
|
$5.88 |
Natural Gas | $33,530 | 4,663 |
MMBtu
|
$7.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,474 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,655 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $108 | $540 | - | - |
$108
-
MMBtu
|
|
02 | 2.4239: Eliminate or reduce compressed air usage | $1,804 | $3,120 |
$1,804
27,759
kWh
|
- | - | |
03 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $1,015 | $4,060 | - | - |
$1,015
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $517 | $2,038 |
$517
7,947
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $330 | $1,042 |
$244
3,756
kWh
|
$86
-
kW-mo/yr
|
- | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $674 | $575 |
$674
10,375
kWh
|
- | - | |
07 | 2.2522: Isolate hot or cold equipment | $26 | $21 | - | - |
$26
-
MMBtu
|
|
TOTAL RECOMMENDED | $4,474 | $11,396 |
$3,239
49,837
kWh
|
$86
-
kW-mo/yr
|
$1,149
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,655 | $4,216 |
$1,435
22,078
kWh
|
$86
-
kW-mo/yr
|
$134
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs