ITAC Assessment: BS0037
ITAC logo
ITAC Assessment: BS0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Cheese and Buttermilk
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $50
M
to 100
M
# of Employees 328
Plant Area 61,045
ft2
Annual Production 4,160
lb
Production Hrs. Annual 2,600
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,396 776,720
kWh
Electricity Demand $16,100 2,739
kW-mo/yr
Natural Gas $33,530 4,663
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,655

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $108 $540 - - $108
-
MMBtu
02 2.4239: Eliminate or reduce compressed air usage $1,804 $3,120 $1,804
27,759
kWh
- -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $1,015 $4,060 - - $1,015
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $517 $2,038 $517
7,947
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $330 $1,042 $244
3,756
kWh
$86
-
kW-mo/yr
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $674 $575 $674
10,375
kWh
- -
07 2.2522: Isolate hot or cold equipment $26 $21 - - $26
-
MMBtu
TOTAL RECOMMENDED $4,474 $11,396 $3,239
49,837
kWh
$86
-
kW-mo/yr
$1,149
-
MMBtu
TOTAL IMPLEMENTED $1,655 $4,216 $1,435
22,078
kWh
$86
-
kW-mo/yr
$134
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs