ITAC Assessment: AM0001
ITAC logo
ITAC Assessment: AM0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product MICRO & MINI COMPUTERS
NAICS
n/a
SIC 3671: Electron Tubes
Sales Range $10
M
to 50
M
# of Employees 206
Plant Area
n/a
Annual Production 310
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,985 2,560,082
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,479 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $544

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.8114: Change rate schedules or other changes in utility service $1,828 $15,000 $1,828
-
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $663 $189 $663
7,034
kWh
03 2.7111: Reduce illumination to minimum necessary levels $950 $398 $950
10,258
kWh
04 2.7447: Install vinyl strip / high speed / air curtain doors $544 $354 $544
10,844
kWh
05 2.7233: Use properly designed and sized hvac equipment $270 $15 $270
4,982
kWh
06 2.7111: Reduce illumination to minimum necessary levels $183 - $183
1,758
kWh
07 2.7111: Reduce illumination to minimum necessary levels $41 - $41
586
kWh
TOTAL RECOMMENDED $4,479 $15,956 $4,479
35,462
kWh
TOTAL IMPLEMENTED $544 $354 $544
10,844
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs