ITAC Assessment: BS0035
ITAC logo
ITAC Assessment: BS0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Exterior Signs
NAICS 332323: Ornamental and Architectural Metal Work Manufacturing
SIC 3993: Signs and Advertising Specialties
Sales Range $5
M
to 10
M
# of Employees 91
Plant Area 60,000
ft2
Annual Production 4,000
pieces
Production Hrs. Annual 2,016
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,224 584,480
kWh
Electricity Demand $13,860 2,463
kW-mo/yr
Electricity Fees $195 -
Natural Gas $41,495 5,828
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,831 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,058

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $65 $132 $65
1,270
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,413 $8,156 $5,413
104,682
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $89 $113 $58
1,130
kWh
$30
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $374 $15 $249
4,816
kWh
$125
-
kW-mo/yr
-
05 2.7243: Improve air circulation with destratification fans / other methods $6,366 $24,165 - - $6,366
-
MMBtu
06 2.7224: Reduce space conditioning during non-working hours $8,299 $50 - - $8,299
-
MMBtu
07 2.7491: Insulate glazing, walls, ceilings, and roofs $7,773 $13,800 - - $7,773
-
MMBtu
08 2.7447: Install vinyl strip / high speed / air curtain doors $452 $340 - - $452
-
MMBtu
TOTAL RECOMMENDED $28,831 $46,771 $5,785
111,898
kWh
$155
-
kW-mo/yr
$22,890
-
MMBtu
TOTAL IMPLEMENTED $21,058 $32,971 $5,785
111,898
kWh
$155
-
kW-mo/yr
$15,117
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs