Assessment Year | 2017 |
---|---|
Principal Product | Fabricated Metal Structures |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $100 M to 500M |
# of Employees | 100 |
Plant Area |
500,940
ft2
|
Annual Production | 15
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $228,556 | 4,686,400 |
kWh
|
$0.049 |
Electricity Demand | $120,715 | 16,814 |
kW-mo/yr
|
$7.18 |
TOTAL YEARLY COSTS | $349,270 | |||
RECOMMENDED SAVINGS* | $82,899 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,809 | $500 |
$1,916
41,274
kWh
|
$2,893
-
kW-mo/yr
|
- | |
02 | 2.2437: Recover waste heat from equipment | $5,614 | $2,800 |
$5,614
111,224
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $27,216 | $28,216 |
$19,808
426,894
kWh
|
$7,408
-
kW-mo/yr
|
- | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $45,260 | $144,180 |
$76,521
1,649,165
kWh
|
- |
$(-31,261.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $82,899 | $175,696 |
$103,859
2,228,557
kWh
|
$10,301
-
kW-mo/yr
|
$(-31,261.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs