ITAC Assessment: OR0693
ITAC logo
ITAC Assessment: OR0693
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Fabricated Metal Structures
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 500,940
ft2
Annual Production 15
units
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $228,556 4,686,400
kWh
Electricity Demand $120,715 16,814
kW-mo/yr
TOTAL YEARLY COSTS $349,270
RECOMMENDED SAVINGS* $82,899 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,809 $500 $1,916
41,274
kWh
$2,893
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $5,614 $2,800 $5,614
111,224
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $27,216 $28,216 $19,808
426,894
kWh
$7,408
-
kW-mo/yr
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $45,260 $144,180 $76,521
1,649,165
kWh
- $(-31,261.0)
-
MMBtu
TOTAL RECOMMENDED $82,899 $175,696 $103,859
2,228,557
kWh
$10,301
-
kW-mo/yr
$(-31,261.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs