ITAC Assessment: BS0004
ITAC logo
ITAC Assessment: BS0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Fiberglass reinforced plastics/bathware
NAICS 326191: Plastics Plumbing Fixture Manufacturing
SIC 3088: Plastics Plumbing Fixtures
Sales Range $10
M
to 50
M
# of Employees 51
Plant Area 106,000
ft2
Annual Production 12,500
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,008 916,880
kWh
Electricity Demand $14,332 3,162
kW-mo/yr
Electricity Fees $384 -
Natural Gas $58,632 8,055
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,532 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,688

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,092 $272 $3,546
87,867
kWh
$546
-
kW-mo/yr
- -
02 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $2,756 $802 $2,824
69,974
kWh
$434
-
kW-mo/yr
- $(-502.0)
03 2.4226: Use / purchase optimum sized compressor $2,382 $5,000 $2,382
59,024
kWh
- - -
04 2.2437: Recover waste heat from equipment $1,570 $3,866 - - $1,570
-
MMBtu
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $653 $885 - - $653
-
MMBtu
-
06 2.7224: Reduce space conditioning during non-working hours $6,840 $34 $30
739
kWh
- $6,810
-
MMBtu
-
07 3.5217: Reuse / recycle/ sell paper products $1,240 $119 - - - $1,240
TOTAL RECOMMENDED $19,532 $10,979 $8,783
217,604
kWh
$980
-
kW-mo/yr
$9,032
-
MMBtu
$738
TOTAL IMPLEMENTED $13,688 $1,108 $6,400
158,580
kWh
$980
-
kW-mo/yr
$6,810
-
MMBtu
$(-502.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs