| Assessment Year | 2012 |
|---|---|
| Principal Product | Fiberglass reinforced plastics/bathware |
| NAICS | 326191: Plastics Plumbing Fixture Manufacturing |
| SIC | 3088: Plastics Plumbing Fixtures |
| Sales Range | $10 M to 50M |
| # of Employees | 51 |
| Plant Area |
106,000
ft2
|
| Annual Production | 12,500
pieces
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $37,008 | 916,880 |
kWh
|
$0.040 |
| Electricity Demand | $14,332 | 3,162 |
kW-mo/yr
|
$4.53 |
| Electricity Fees | $384 | - |
|
- |
| Natural Gas | $58,632 | 8,055 |
MMBtu
|
$7.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,532 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,688 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,092 | $272 |
$3,546
87,867
kWh
|
$546
-
kW-mo/yr
|
- | - | |
| 02 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $2,756 | $802 |
$2,824
69,974
kWh
|
$434
-
kW-mo/yr
|
- | $(-502.0) | |
| 03 | 2.4226: Use / purchase optimum sized compressor | $2,382 | $5,000 |
$2,382
59,024
kWh
|
- | - | - | |
| 04 | 2.2437: Recover waste heat from equipment | $1,570 | $3,866 | - | - |
$1,570
-
MMBtu
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $653 | $885 | - | - |
$653
-
MMBtu
|
- | |
| 06 | 2.7224: Reduce space conditioning during non-working hours | $6,840 | $34 |
$30
739
kWh
|
- |
$6,810
-
MMBtu
|
- | |
| 07 | 3.5217: Reuse / recycle/ sell paper products | $1,240 | $119 | - | - | - | $1,240 | |
| TOTAL RECOMMENDED | $19,532 | $10,979 |
$8,783
217,604
kWh
|
$980
-
kW-mo/yr
|
$9,032
-
MMBtu
|
$738 | ||
| TOTAL IMPLEMENTED | $13,688 | $1,108 |
$6,400
158,580
kWh
|
$980
-
kW-mo/yr
|
$6,810
-
MMBtu
|
$(-502.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs