ITAC Assessment: BD0454
ITAC logo
ITAC Assessment: BD0454
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Custom machined parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area 236,427
ft2
Annual Production 1,300,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $453,623 9,968,386
kWh
Electricity Demand $32,465 19,755
kW-mo/yr
Electricity Fees $8,257 -
Natural Gas $70,035 8,710
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,230 $20 $4,891
107,490
kWh
$339
-
kW-mo/yr
- - - -
02 2.7447: Install vinyl strip / high speed / air curtain doors $3,872 $3,000 $1,487
32,695
kWh
$1,340
-
kW-mo/yr
$1,045
-
MMBtu
- - -
03 2.4314: Use synthetic lubricant $2,717 $1,400 $2,541
55,860
kWh
$176
-
kW-mo/yr
- - - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,875 $1,450 - - $3,875
-
MMBtu
- - -
05 2.7134: Use photocell controls $2,121 $825 $1,075
23,622
kWh
$223
-
kW-mo/yr
- - $416 $407
06 2.4221: Install compressor air intakes in coolest locations $2,034 $500 $1,902
41,802
kWh
$132
-
kW-mo/yr
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,811 $2,500 $1,694
37,240
kWh
$117
-
kW-mo/yr
- - - -
08 2.7135: Install occupancy sensors $1,054 $900 $1,054
23,178
kWh
- - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $780 $693 $671
14,344
kWh
$81
-
kW-mo/yr
- - $8 $20
10 2.7142: Utilize higher efficiency lamps and/or ballasts $384 $650 $196
4,327
kWh
$10
-
kW-mo/yr
- - $74 $104
11 2.3131: Reschedule plant operations or reduce load to avoid peaks $98 $20 - $98
-
kW-mo/yr
- - - -
12 3.5315: Lease / purchase baler; sell cardboard to recycler $1,444 $2,700 - - - $1,444
-
lb
- -
TOTAL RECOMMENDED $25,420 $14,658 $15,511
340,558
kWh
$2,516
-
kW-mo/yr
$4,920
-
MMBtu
$1,444
-
lb
$498 $531
TOTAL IMPLEMENTED - - - - - - - -