ITAC Assessment: TA0011
ITAC logo
ITAC Assessment: TA0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Garage Door Window Trim
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 93,500
ft2
Annual Production 3,000
units
Production Hrs. Annual 3,412
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,454 1,745,120
kWh
Electricity Demand $64,548 8,037
kW-mo/yr
Electricity Fees $4,451 -
Natural Gas $7,083 828
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,315

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.8114: Change rate schedules or other changes in utility service $5,600 - - $5,600
-
kW-mo/yr
02 2.2511: Insulate bare equipment $2,340 $360 $2,340
62,426
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,645 $400 $1,645
49,277
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $730 $210 $730
21,810
kWh
-
05 2.4314: Use synthetic lubricant $715 - $715
9,412
kWh
-
TOTAL RECOMMENDED $11,030 $970 $5,430
142,925
kWh
$5,600
-
kW-mo/yr
TOTAL IMPLEMENTED $10,315 $970 $4,715
133,513
kWh
$5,600
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs