ITAC Assessment: UD0236
ITAC logo
ITAC Assessment: UD0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product IRON & STEEL CASTINGS
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area
n/a
Annual Production 10,000
ton
Production Hrs. Annual 5,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $532,775 7,264,361
kWh
Natural Gas $91,679 19,086
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,209 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,157

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $102,264 $500,000 $102,264
480,070
kWh
- -
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,157 - $7,527
34,877
kWh
$(-370.0)
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,089 $2,400 $1,582
34,291
kWh
$(-363.0)
-
MMBtu
$870
04 2.2491: Use cooling air which cools hot work pieces for space heating $6,699 $28,000 - $6,699
-
MMBtu
-
TOTAL RECOMMENDED $118,209 $530,400 $111,373
549,238
kWh
$5,966
-
MMBtu
$870
TOTAL IMPLEMENTED $7,157 - $7,527
34,877
kWh
$(-370.0)
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs