| Assessment Year | 1989 |
|---|---|
| Principal Product | POTATO CHIPS,NUTS,BUTTER |
| NAICS |
n/a
|
| SIC | 2096: Potato Chips, Corn Chips, and Similar Snacks |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
n/a
|
| Annual Production | 1,700,000
lb
|
| Production Hrs. Annual | 3,366
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $14,254 | 269,930 |
kWh
|
$0.053 |
| Natural Gas | $57,761 | 13,242 |
MMBtu
|
$4.36 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,126 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,048 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $134 | $200 |
$134
2,638
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $76 | $50 |
$76
1,465
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $40 | $49 |
$40
879
kWh
|
- | |
| 04 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $2,002 | $3,264 | - |
$2,002
-
MMBtu
|
|
| 05 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $4,874 | $7,000 | - |
$4,874
-
MMBtu
|
|
| TOTAL RECOMMENDED | $7,126 | $10,563 |
$250
4,982
kWh
|
$6,876
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $5,048 | $7,249 |
$174
3,517
kWh
|
$4,874
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs