ITAC Assessment: BD0393
ITAC logo
ITAC Assessment: BD0393
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Cheese
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 157,800
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 6,264
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $309,932 5,037,224
kWh
Electricity Demand $57,304 9,430
kW-mo/yr
Electricity Fees $79,385 -
Natural Gas $325,301 43,927
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,214 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,644

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1221: Replace obsolete burners with more efficient ones $54,406 $4,000 - - $54,406
-
MMBtu
02 2.1213: Direct warmest air to combustion intake $8,510 $10,000 $(-171.0)
(-2,773)
kWh
- $8,681
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,288 $107,000 $11,527
187,457
kWh
$2,761
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $7,570 $9,600 $5,286
85,954
kWh
$2,284
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $2,084 $1,500 $1,752
28,482
kWh
$332
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $201 $10 $169
2,745
kWh
$32
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $155 $300 $104
1,696
kWh
$51
-
kW-mo/yr
-
TOTAL RECOMMENDED $87,214 $132,410 $18,667
303,561
kWh
$5,460
-
kW-mo/yr
$63,087
-
MMBtu
TOTAL IMPLEMENTED $14,644 $107,310 $11,800
191,898
kWh
$2,844
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs