ITAC Assessment: BD0342
ITAC logo
ITAC Assessment: BD0342
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Ductile iron castings
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 66
Plant Area 38,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 4,394
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $397,718 7,341,985
kWh
Electricity Demand $124,637 33,592
kW-mo/yr
Electricity Fees $84,704 -
Natural Gas $56,788 12,159
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,725 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,173

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,172 $6,590 $5,200
95,947
kWh
$972
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $383 $601 $302
5,578
kWh
$81
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $261 $301 $180
3,329
kWh
$17
-
kW-mo/yr
- $29 $35
04 2.4221: Install compressor air intakes in coolest locations $1,269 $101 $1,069
19,730
kWh
$200
-
kW-mo/yr
- - -
05 2.2437: Recover waste heat from equipment $3,573 $751 - - $3,573
-
MMBtu
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $885 $2 $746
13,767
kWh
$139
-
kW-mo/yr
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,173 $801 $2,673
49,307
kWh
$500
-
kW-mo/yr
- - -
08 2.4133: Use most efficient type of electric motors $3,407 $4,191 $2,881
53,154
kWh
$526
-
kW-mo/yr
- - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $844 $845 $713
13,152
kWh
$131
-
kW-mo/yr
- - -
10 2.7447: Install vinyl strip / high speed / air curtain doors $31,758 $72,001 - - $3,633
-
MMBtu
$28,125 -
TOTAL RECOMMENDED $51,725 $86,184 $13,764
253,964
kWh
$2,566
-
kW-mo/yr
$7,206
-
MMBtu
$28,154 $35
TOTAL IMPLEMENTED $3,173 $801 $2,673
49,307
kWh
$500
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs