Assessment Year | 2007 |
---|---|
Principal Product | Investment Castings |
NAICS | 331410: Nonferrous Metal (except Aluminum) Smelting and Refining |
SIC | 3339: Primary Smelting and Refining of Nonferrous Metals, Except Copper and Aluminum |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
65,000
ft2
|
Annual Production | 15,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $545,103 | 6,681,600 |
kWh
|
$0.082 |
Electricity Demand | $291,906 | 17,234 |
kW-mo/yr
|
$16.94 |
Natural Gas | $535,558 | 43,923 |
MMBtu
|
$12.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $235,244 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $130,649 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,716 | - | - | - |
$5,716
-
MMBtu
|
- | - | |
02 | 2.2135: Repair and eliminate steam leaks | $2,998 | - | - | - |
$2,998
-
MMBtu
|
- | - | |
03 | 2.2135: Repair and eliminate steam leaks | $529 | - |
$529
14,036
kWh
|
- | - | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $4,392 | $919 |
$3,307
94,072
kWh
|
$1,085
-
kW-mo/yr
|
- | - | - | |
05 | 2.8114: Change rate schedules or other changes in utility service | $99,580 | $37,915 | - | - | - | - | $99,580 | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,960 | $9,373 |
$13,954
173,409
kWh
|
$5,006
-
kW-mo/yr
|
- | - | - | |
07 | 2.7241: Install outside air damper / economizer on hvac unit | $20,686 | $15,000 | - | - |
$20,686
-
MMBtu
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,585 | $1,620 | - |
$1,585
-
kW-mo/yr
|
- | - | - | |
09 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $51,342 | $60,000 | - | - |
$51,342
-
MMBtu
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,113 | $1,512 |
$773
9,362
kWh
|
$340
-
kW-mo/yr
|
- | - | - | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,983 | $19,920 |
$9,983
124,064
kWh
|
- | - | - | - | |
12 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $904 | $2,887 |
$904
11,239
kWh
|
- | - | - | - | |
13 | 3.5218: Reuse / recycle/ sell rubber products | $17,456 | - | - | - | - |
$17,456
-
lb
|
- | |
TOTAL RECOMMENDED | $235,244 | $149,146 |
$29,450
426,182
kWh
|
$8,016
-
kW-mo/yr
|
$80,742
-
MMBtu
|
$17,456
-
lb
|
$99,580 | ||
TOTAL IMPLEMENTED | $130,649 | $106,832 |
$27,773
405,581
kWh
|
$7,676
-
kW-mo/yr
|
$77,744
-
MMBtu
|
$17,456
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs