ITAC Assessment: BD0340
ITAC logo
ITAC Assessment: BD0340
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Couplings For Hoses
NAICS 332912: Fluid Power Valve and Hose Fitting Manufacturing
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 115,200
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $491,354 7,071,110
kWh
Electricity Demand $71,430 15,436
kW-mo/yr
Electricity Fees $7,230 -
Natural Gas $52,424 7,650
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $868,378 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $93,388 $17,061 $83,646
1,203,545
kWh
$9,742
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $4,786 $1,501 $4,143
59,610
kWh
$643
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $468 $381 $278
3,995
kWh
$25
-
kW-mo/yr
- $69 $96 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,817 $2 $6,104
87,821
kWh
$713
-
kW-mo/yr
- - - -
05 2.4221: Install compressor air intakes in coolest locations $4,013 $1,501 $3,594
51,712
kWh
$419
-
kW-mo/yr
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $68,540 $501 $61,390
883,295
kWh
$7,150
-
kW-mo/yr
- - - -
07 2.2437: Recover waste heat from equipment $4,077 $2,001 - - $4,077
-
MMBtu
- - -
08 2.7231: Use radiant heater for spot heating $8,829 $30,001 - - $8,829
-
MMBtu
- - -
09 2.7447: Install vinyl strip / high speed / air curtain doors $15,245 $12,000 - - $7,757
-
MMBtu
$7,488 - -
10 4.111: Add equipment/ operators to reduce production bottleneck $662,215 $1,001 - - - $141,856 - $520,359
TOTAL RECOMMENDED $868,378 $65,950 $159,155
2,289,978
kWh
$18,692
-
kW-mo/yr
$20,663
-
MMBtu
$149,413 $96 $520,359
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs