ITAC Assessment: BD0328
ITAC logo
ITAC Assessment: BD0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Newsprint
NAICS 424110: Printing and Writing Paper Merchant Wholesalers
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 217
Plant Area 70,000
ft2
Annual Production 5,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,386 3,169,510
kWh
Natural Gas $12,785 1,845
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,486

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $7,446 $2,400 $7,446
878
kWh
- - -
02 2.7447: Install vinyl strip / high speed / air curtain doors $4,262 $14,000 $612
72
kWh
- - $3,650
03 2.7134: Use photocell controls $1,823 $90 $878
47
kWh
$1
-
kW-mo/yr
- $944
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,358 $2,109 $1,357
91
kWh
$1
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $1,328 $150 $1,328
78
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $498 $585 $354
23
kWh
- - $144
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,183 $2,730 $1,183
79
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $1,128 $500 $1,127
66
kWh
$1
-
kW-mo/yr
- -
09 3.4151: Minimize water usage $1,171 $4,000 - - $1,171
-
Tgal
-
TOTAL RECOMMENDED $20,197 $26,564 $14,285
1,334
kWh
$3
-
kW-mo/yr
$1,171
-
Tgal
$4,738
TOTAL IMPLEMENTED $2,486 $2,609 $2,484
157
kWh
$2
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs