ITAC Assessment: BD0325
ITAC logo
ITAC Assessment: BD0325
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Crankshafts
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3462: Iron and Steel Forgings
Sales Range $50
M
to 100
M
# of Employees 275
Plant Area 175,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,634,538 62,828,340
kWh
Natural Gas $202,327 18,887
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $264,728 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,262

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7231: Use radiant heater for spot heating $161,695 $11,200 - - $161,695
-
MMBtu
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $8,418 $15,000 - - $8,418
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $39,183 $10,000 $39,183
935,152
kWh
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $21,908 - $21,908
522,854
kWh
- - - -
05 2.4221: Install compressor air intakes in coolest locations $13,004 $2,000 $13,004
310,361
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $10,814 $3,375 $5,402
246,692
kWh
$3,953
-
kW-mo/yr
- $417 $1,042
07 2.7134: Use photocell controls $4,835 $800 $1,589
72,571
kWh
$2,791
-
kW-mo/yr
- $130 $325
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,427 $9,000 $2,556
116,733
kWh
$1,871
-
kW-mo/yr
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $444 $505 $124
5,663
kWh
$78
-
kW-mo/yr
- $106 $136
TOTAL RECOMMENDED $264,728 $51,880 $83,766
2,210,026
kWh
$8,693
-
kW-mo/yr
$170,113
-
MMBtu
$653 $1,503
TOTAL IMPLEMENTED $9,262 $9,800 $4,145
189,304
kWh
$4,662
-
kW-mo/yr
- $130 $325
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs