| Assessment Year | 2021 |
|---|---|
| Principal Product | Canned Beverages |
| NAICS | 312111: Soft Drink Manufacturing |
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $100 M to 500M |
| # of Employees | 62 |
| Plant Area |
50,000
ft2
|
| Annual Production | 27,000
Tgal
|
| Production Hrs. Annual | 7,956
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $467,853 | 5,298,792 |
kWh
|
$0.088 | |
| Electricity Demand | $84,419 | 11,976 |
kW-mo/yr
|
$7.05 | |
| Electricity Fees | $4,450 | - |
|
- | |
| Natural Gas | $94,615 | 15,670 |
MMBtu
|
$6.04 | |
| Waste Disposal Costs | |||||
| Water Usage | $45,722 | 5,421 |
Tgal
|
$8.43 | |
| TOTAL YEARLY COSTS | $697,059 | ||||
| RECOMMENDED SAVINGS* | $104,200 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $60,170 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings |
|---|---|---|---|---|---|---|---|
| 01 | 3.4154: Eliminate leaks in water lines and valves | $5,300 | $425 | - |
$3,100
-
MMBtu
|
$2,200
-
Tgal
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,750 | $2,550 |
$12,750
122,600
kWh
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $6,300 | $3,250 |
$2,680
25,730
kWh
|
$3,620
-
MMBtu
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $28,940 | $20,000 |
$28,940
278,300
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,110 | $72,258 |
$13,110
126,013
kWh
|
- | - | |
| 06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $12,820 | $24,000 |
$16,720
160,800
kWh
|
$(-3,900.0)
-
MMBtu
|
- | |
| 07 | 2.1221: Replace obsolete burners with more efficient ones | $24,980 | $15,000 | - |
$24,980
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $104,200 | $137,483 |
$74,200
713,443
kWh
|
$27,800
-
MMBtu
|
$2,200
-
Tgal
|
||
| TOTAL IMPLEMENTED | $60,170 | $116,683 |
$58,770
565,113
kWh
|
$(-800.0)
-
MMBtu
|
$2,200
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs