ITAC Assessment: AS0324
ITAC logo
ITAC Assessment: AS0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Flexographic laser and letterpress printing, computer typesetting, color
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 150,000
ft2
Annual Production 250,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,678 3,357,233
kWh
Electricity Demand $7,992 667
kW-mo/yr
Electricity Fees $40,518 -
Natural Gas $40,595 5,377
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $174,998 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,479

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $6,071 $1,750 - - $6,071
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,718 $4,200 $11,735
149,489
kWh
$983
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,806 $9,004 $5,056
65,078
kWh
$750
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $444 $1,400 $322
4,364
kWh
$122
-
kW-mo/yr
- -
05 2.7111: Reduce illumination to minimum necessary levels $8,673 - $8,673
109,982
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,714 $120 $3,392
39,116
kWh
$322
-
kW-mo/yr
- -
07 2.7145: Install skylights $5,831 $6,702 $5,831
74,280
kWh
- - -
08 2.4133: Use most efficient type of electric motors $464 $230 $420
5,352
kWh
$44
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $77,357 $15,800 $71,378
909,269
kWh
$5,979
-
kW-mo/yr
- -
10 4.521: Clear and rent existing space $53,920 $5,308 - - - $53,920
TOTAL RECOMMENDED $174,998 $44,514 $106,807
1,356,930
kWh
$8,200
-
kW-mo/yr
$6,071
-
MMBtu
$53,920
TOTAL IMPLEMENTED $14,479 $9,004 $13,729
175,060
kWh
$750
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings