Assessment Year | 2007 |
---|---|
Principal Product | crank shafts |
NAICS | 332111: Iron and Steel Forging |
SIC | 3462: Iron and Steel Forgings |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
175,000
ft2
|
Annual Production | 800,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,011,349 | 15,220,614 |
kWh
|
$0.066 |
Natural Gas | $98,297 | 12,071 |
MMBtu
|
$8.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $82,854 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $82,854 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $58,812 | $12,000 | - | - |
$58,812
-
MMBtu
|
- | - | |
02 | 2.7231: Use radiant heater for spot heating | $17,557 | $16,000 | - | - |
$17,557
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,458 | $4,133 |
$1,718
71,011
kWh
|
$1,646
-
kW-mo/yr
|
- | $62 | $32 | |
04 | 2.7134: Use photocell controls | $594 | $200 |
$174
7,176
kWh
|
$399
-
kW-mo/yr
|
- | $7 | $14 | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $526 | $300 |
$233
9,642
kWh
|
$266
-
kW-mo/yr
|
- | $18 | $9 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $219 | $270 |
$64
2,663
kWh
|
$43
-
kW-mo/yr
|
- | $48 | $64 | |
07 | 2.4234: Cool compressor air intake with heat exchanger | $1,688 | $2,500 | - | - |
$1,688
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $82,854 | $35,403 |
$2,189
90,492
kWh
|
$2,354
-
kW-mo/yr
|
$78,057
-
MMBtu
|
$135 | $119 | ||
TOTAL IMPLEMENTED | $82,854 | $35,403 |
$2,189
90,492
kWh
|
$2,354
-
kW-mo/yr
|
$78,057
-
MMBtu
|
$135 | $119 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs