ITAC Assessment: BD0302
ITAC logo
ITAC Assessment: BD0302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Orthodics and Ankle Braces
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 40,000
ft2
Annual Production 122,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,419 979,300
kWh
Electricity Demand $9,814 4,179
kW-mo/yr
Electricity Fees $3,283 -
Natural Gas $6,692 617
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,270 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,239

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7111: Reduce illumination to minimum necessary levels $3,774 - $3,136
50,016
kWh
$638
-
kW-mo/yr
- -
02 2.7221: Lower temperature during the winter season and vice-versa $3,381 - $3,381
80,683
kWh
- - -
03 2.7231: Use radiant heater for spot heating $1,699 $5,000 - - $1,699
-
MMBtu
-
04 2.7221: Lower temperature during the winter season and vice-versa $1,130 - - - $1,130
-
MMBtu
-
05 2.4226: Use / purchase optimum sized compressor $848 $260 $728
11,608
kWh
$120
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $835 $1,050 $696
11,285
kWh
$139
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1 - $1
1
kWh
- - -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,195 $1,550 $1,011
16,124
kWh
$184
-
kW-mo/yr
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $384 - $330
5,263
kWh
$54
-
kW-mo/yr
- -
10 2.6231: Utilize controls to operate equipment only when needed $344 $500 $290
4,624
kWh
$54
-
kW-mo/yr
- -
11 2.4133: Use most efficient type of electric motors $304 $2,550 $245
3,910
kWh
$59
-
kW-mo/yr
- -
12 3.4151: Minimize water usage $2,375 $1,725 - - - $2,375
-
Tgal
TOTAL RECOMMENDED $16,270 $12,635 $9,818
183,514
kWh
$1,248
-
kW-mo/yr
$2,829
-
MMBtu
$2,375
-
Tgal
TOTAL IMPLEMENTED $5,239 $500 $4,001
90,570
kWh
$108
-
kW-mo/yr
$1,130
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs