ITAC Assessment: BD0276
ITAC logo
ITAC Assessment: BD0276
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Ferrous metal parts
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 207,900
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,673 2,224,909
kWh
Electricity Fees $25,041 -
Natural Gas $133,516 18,128
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,821 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,544

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.7231: Use radiant heater for spot heating $27,550 $24,000 - $27,550
-
MMBtu
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $14,544 $48,000 - $7,056
-
MMBtu
- $7,488
03 2.1213: Direct warmest air to combustion intake $8,381 $2,000 - $8,381
-
MMBtu
- -
04 2.4133: Use most efficient type of electric motors $4,365 $13,346 n/a $4,365
77,392
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,120 $740 $2,120
38,812
kWh
- - -
06 2.7135: Install occupancy sensors $1,665 $225 $1,665
29,338
kWh
- - -
07 2.1222: Install turbulators $1,362 $2,150 - $1,362
-
MMBtu
- -
08 2.4221: Install compressor air intakes in coolest locations $474 $800 $474
8,394
kWh
- - -
09 3.4115: Recover and reuse cooling water $1,360 $4,000 - - $1,360
-
Tgal
-
TOTAL RECOMMENDED $61,821 $95,261 $8,624
153,936
kWh
$44,349
-
MMBtu
$1,360
-
Tgal
$7,488
TOTAL IMPLEMENTED $14,544 $48,000 - $7,056
-
MMBtu
- $7,488
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs