ITAC Assessment: MU0018
ITAC logo
ITAC Assessment: MU0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Bare Printed Circuit Boards
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 150,000
ft2
Annual Production 2,777,230
units
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $468,285 11,233,744
kWh
Electricity Demand $340,917 42,851
kW-mo/yr
Electricity Fees $42,670 -
Natural Gas $149,019 20,790
MMBtu
TOTAL YEARLY COSTS $1,000,891
RECOMMENDED SAVINGS* $9,072 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,459

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,260 $4,730 $4,965
99,302
kWh
$2,295
-
kW-mo/yr
-
02 2.7444: Close holes and openings in building such as broken windows $964 $45 $791
15,826
kWh
$173
-
kW-mo/yr
-
03 2.6211: Conserve energy by efficient use of vending machines $483 $730 $396
7,978
kWh
$87
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $235 $182 $193
3,856
kWh
$42
-
kW-mo/yr
-
05 2.7291: Reschedule and rearrange multiple-source heating systems $77 - - - $77
-
MMBtu
06 2.7111: Reduce illumination to minimum necessary levels $54 $40 $44
874
kWh
$10
-
kW-mo/yr
-
TOTAL RECOMMENDED $9,072 $5,727 $6,389
127,835
kWh
$2,606
-
kW-mo/yr
$77
-
MMBtu
TOTAL IMPLEMENTED $8,459 $4,957 $5,949
118,984
kWh
$2,510
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs