ITAC Assessment: BD0243
ITAC logo
ITAC Assessment: BD0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Hydraulic Manifolds and Screw In Cartridge Valves
NAICS 332912: Fluid Power Valve and Hose Fitting Manufacturing
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $10
M
to 50
M
# of Employees 113
Plant Area 56,000
ft2
Annual Production 2,200,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,486 3,048,000
kWh
Natural Gas $31,236 6,907
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $313,996 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,737

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $14,372 $2,000 - $14,372
-
MMBtu
- - - -
02 2.7135: Install occupancy sensors $13,962 $8,250 $12,205
226,384
kWh
- - $166 - $1,591
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,415 $1,200 $13,415
248,845
kWh
- - - - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $11,730 $40,000 - $7,839
-
MMBtu
- $3,891 - -
05 2.7111: Reduce illumination to minimum necessary levels $7,799 $1,965 $6,792
125,991
kWh
- - $85 - $922
06 2.4221: Install compressor air intakes in coolest locations $3,406 $1,000 $3,406
63,183
kWh
- - - - -
07 2.7231: Use radiant heater for spot heating $2,458 $4,000 - $2,458
-
MMBtu
- - - -
08 2.4133: Use most efficient type of electric motors $2,277 $2,030 $2,277
42,255
kWh
- - - - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,840 - $1,840
34,134
kWh
- - - - -
10 2.4235: Remove or close off unneeded compressed air lines $1,838 $2,460 $1,838
34,091
kWh
- - - - -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $816 $185 $816
15,150
kWh
- - - - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $567 $500 $323
5,992
kWh
- - $103 - $141
13 2.7134: Use photocell controls $168 $500 $136
2,515
kWh
- - $9 - $23
14 3.5315: Lease / purchase baler; sell cardboard to recycler $1,772 $5,500 - - $1,772
-
lb
- - -
15 3.5316: Contract a wood pallet recycling company $1,305 $4,243 - - $1,305
-
lb
- - -
16 4.426: Modify workload $186,751 $10,000 - - - $186,751 - -
17 3.6192: Use a less expensive method of waste removal $49,200 $1,000 - - - - $49,200 -
18 4.821: Pay bills on time to avoid late fees $320 - - - - - $320 -
TOTAL RECOMMENDED $313,996 $84,833 $43,048
798,540
kWh
$24,669
-
MMBtu
$3,077
-
lb
$191,005 $49,520 $2,677
TOTAL IMPLEMENTED $93,737 $17,905 $41,773
774,883
kWh
- - $251 $49,200 $2,513
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs