ITAC Assessment: UD0420
ITAC logo
ITAC Assessment: UD0420
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Flexible packaging
NAICS
n/a
SIC 2754: Commercial Printing, Gravure
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 100,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $297,367 4,704,865
kWh
Natural Gas $210,642 40,650
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $137,056 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,517

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $25,572 $16,000 $25,572
-
kWh
-
02 2.8113: Purchase gas directly from a contract gas supplier $64,530 $13,000 $64,530
-
kWh
-
03 2.3191: Use demand controller or load shedder $14,071 $250 $14,071
-
kWh
-
04 2.3191: Use demand controller or load shedder $1,840 - $1,840
-
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,048 $2,456 $1,048
-
kWh
-
06 2.2437: Recover waste heat from equipment $3,897 $3,000 - $3,897
-
MMBtu
07 2.5195: Change product design to reduce energy requirements $26,098 - - $26,098
-
MMBtu
TOTAL RECOMMENDED $137,056 $34,706 $107,061
-
kWh
$29,995
-
MMBtu
TOTAL IMPLEMENTED $30,517 $21,456 $26,620
-
kWh
$3,897
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs