ITAC Assessment: BD0188
ITAC logo
ITAC Assessment: BD0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Electrical Control Panels and Mobile Generator Sets
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 181
Plant Area 130,560
ft2
Annual Production 525
pieces
Production Hrs. Annual 2,730
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,154 1,057,648
kWh
Electricity Demand $10,364 4,350
kW-mo/yr
Electricity Fees $463 -
Natural Gas $84,799 9,820
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,113 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,240

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7231: Use radiant heater for spot heating $19,999 $78,750 n/a - - $19,999
-
MMBtu
- - -
02 2.7111: Reduce illumination to minimum necessary levels $1,751 $3,000 $1,248
18,299
kWh
$447
-
kW-mo/yr
- - - $56
03 2.7135: Install occupancy sensors $1,505 $2,025 $1,209
17,734
kWh
$296
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $167 $253 $159
2,330
kWh
$8
-
kW-mo/yr
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $223 - $188
2,751
kWh
$35
-
kW-mo/yr
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $188 $500 $159
2,331
kWh
$29
-
kW-mo/yr
- - - -
07 2.4221: Install compressor air intakes in coolest locations $145 $300 $122
1,790
kWh
$23
-
kW-mo/yr
- - - -
08 3.4151: Minimize water usage $1,095 $1,035 - - - $1,095
-
Tgal
- -
09 4.231: Purchase equipment instead of leasing $18,000 $50,000 n/a - - - - - $18,000
10 4.231: Purchase equipment instead of leasing $10,800 $20,000 n/a - - - - - $10,800
11 4.447: Automate payroll system $1,240 $1,400 - - - - $1,240 -
TOTAL RECOMMENDED $55,113 $157,263 $3,085
45,235
kWh
$838
-
kW-mo/yr
$19,999
-
MMBtu
$1,095
-
Tgal
$1,240 $28,856
TOTAL IMPLEMENTED $1,240 $1,400 - - - - $1,240 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs