Assessment Year | 1997 |
---|---|
Principal Product | Conveyor Bearings |
NAICS |
n/a
|
SIC | 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
84,000
ft2
|
Annual Production | 40,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $280,765 | 4,832,943 |
kWh
|
$0.058 |
Electricity Demand | $47,897 | 11,486 |
kW-mo/yr
|
$4.17 |
Electricity Fees | $6,199 | - |
|
- |
Natural Gas | $99,754 | 29,070 |
MMBtu
|
$3.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $480,253 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,922 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $30,091 | $39,935 |
$23,902
639,215
kWh
|
$5,125
-
kW-mo/yr
|
- | $223 | - | $841 | |
02 | 2.4133: Use most efficient type of electric motors | $6,460 | $15,130 |
$5,563
148,886
kWh
|
$897
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $5,982 | $1,393 |
$5,982
493,845
kWh
|
- | - | - | - | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,884 | $3,750 |
$4,884
403,283
kWh
|
- | - | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,696 | $800 |
$1,413
37,808
kWh
|
$283
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7135: Install occupancy sensors | $1,109 | $825 |
$980
26,084
kWh
|
$129
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $462 | $1,309 |
$331
8,792
kWh
|
$131
-
kW-mo/yr
|
- | - | - | - | |
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $5,801 | $7,000 | - | - |
$1,306
-
lb
|
$(-1,571.0) | - | $6,066 | |
09 | 3.4111: Use closed cycle process to minimize waste water production | $438 | $840 | - | - | - | - | $438 | - | |
10 | 4.441: Install automatic packing equipment | $423,330 | $400,000 | - | - | - | $423,330 | - | - | |
TOTAL RECOMMENDED | $480,253 | $470,982 |
$43,055
1,757,913
kWh
|
$6,565
-
kW-mo/yr
|
$1,306
-
lb
|
$421,982 | $438 | $6,907 | ||
TOTAL IMPLEMENTED | $6,922 | $16,439 |
$5,894
157,678
kWh
|
$1,028
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs