ITAC Assessment: BD0078
ITAC logo
ITAC Assessment: BD0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Conveyor Bearings
NAICS
n/a
SIC 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 84,000
ft2
Annual Production 40,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $280,765 4,832,943
kWh
Electricity Demand $47,897 11,486
kW-mo/yr
Electricity Fees $6,199 -
Natural Gas $99,754 29,070
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $480,253 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,922

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $30,091 $39,935 $23,902
639,215
kWh
$5,125
-
kW-mo/yr
- $223 - $841
02 2.4133: Use most efficient type of electric motors $6,460 $15,130 $5,563
148,886
kWh
$897
-
kW-mo/yr
- - - -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $5,982 $1,393 $5,982
493,845
kWh
- - - - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $4,884 $3,750 $4,884
403,283
kWh
- - - - -
05 2.4221: Install compressor air intakes in coolest locations $1,696 $800 $1,413
37,808
kWh
$283
-
kW-mo/yr
- - - -
06 2.7135: Install occupancy sensors $1,109 $825 $980
26,084
kWh
$129
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $462 $1,309 $331
8,792
kWh
$131
-
kW-mo/yr
- - - -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $5,801 $7,000 - - $1,306
-
lb
$(-1,571.0) - $6,066
09 3.4111: Use closed cycle process to minimize waste water production $438 $840 - - - - $438 -
10 4.441: Install automatic packing equipment $423,330 $400,000 - - - $423,330 - -
TOTAL RECOMMENDED $480,253 $470,982 $43,055
1,757,913
kWh
$6,565
-
kW-mo/yr
$1,306
-
lb
$421,982 $438 $6,907
TOTAL IMPLEMENTED $6,922 $16,439 $5,894
157,678
kWh
$1,028
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs