| Assessment Year | 1995 |
|---|---|
| Principal Product | Air compressors and blowers |
| NAICS |
n/a
|
| SIC | 3561: Pumps and Pumping Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 306 |
| Plant Area |
601,816
ft2
|
| Annual Production | 162,000
units
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $767,270 | 14,836,460 |
kWh
|
$0.052 |
| Natural Gas | $266,748 | 57,644 |
MMBtu
|
$4.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $97,746 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $20,168 | $48,220 |
$20,168
389,801
kWh
|
- | - | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $9,713 | $2,550 | - |
$9,713
-
MMBtu
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $19,452 | $5,250 |
$19,452
376,026
kWh
|
- | - | |
| 04 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $24,032 | $3,500 | - | - |
$24,032
-
gal
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $2,085 | $1,500 |
$2,085
40,445
kWh
|
- | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $864 | $20 |
$864
16,706
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,432 | $44,120 |
$21,432
414,420
kWh
|
- | - | |
| TOTAL RECOMMENDED | $97,746 | $105,160 |
$64,001
1,237,398
kWh
|
$9,713
-
MMBtu
|
$24,032
-
gal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs