ITAC Assessment: BD0034
ITAC logo
ITAC Assessment: BD0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Automobile Seats
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 20,000
ft2
Annual Production 207,000
pieces
Production Hrs. Annual 4,810
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,525 1,913,540
kWh
Natural Gas $7,206 1,860
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,269

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $36,269 $34,000 $50,862
405,334
kWh
$(-14,593.0)
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $3,656 $6,500 $308
4,103
kWh
$3,348
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $225 $300 $225
2,931
kWh
-
04 2.4133: Use most efficient type of electric motors $945 $2,910 $945
12,896
kWh
-
05 2.7135: Install occupancy sensors $1,975 $450 $1,975
26,671
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $403 $546 $403
5,569
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $263 $350 $263
3,517
kWh
-
TOTAL RECOMMENDED $43,736 $45,056 $54,981
461,021
kWh
$(-11,245.0)
-
MMBtu
TOTAL IMPLEMENTED $36,269 $34,000 $50,862
405,334
kWh
$(-14,593.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs