ITAC Assessment: UD1124
ITAC logo
ITAC Assessment: UD1124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Warehousing, Packing, Spray Drying, and Transportation services
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 310,000
ft2
Annual Production 1,001
units
Production Hrs. Annual 2,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,898 884,800
kWh
Electricity Demand $11,931 1,885
kW-mo/yr
Electricity Fees $2,542 -
Natural Gas $50,034 4,220
MMBtu
Waste Disposal Costs
Water Usage $3,714 92
Tgal
Water Disposal $873 92
Tgal
TOTAL YEARLY COSTS $154,992
RECOMMENDED SAVINGS* $18,410 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $2,950 - - $2,950
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $165 - $84
866
kWh
$81
-
kW-mo/yr
- -
03 2.7233: Use properly designed and sized hvac equipment $9,836 $1,500 $9,019
92,888
kWh
$817
-
kW-mo/yr
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $198 $375 - - $198
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,261 $6,149 $3,590
36,972
kWh
$1,404
-
kW-mo/yr
- $267
TOTAL RECOMMENDED $18,410 $8,024 $12,693
130,726
kWh
$5,252
-
kW-mo/yr
$198
-
MMBtu
$267
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs