ITAC Assessment: UM0314
ITAC logo
ITAC Assessment: UM0314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Automotive Climate Control Assemblies
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range n/a
# of Employees 1,500
Plant Area 1,000,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,128,000 43,352,400
kWh
Electricity Demand $1,092,107 85,420
kW-mo/yr
Electricity Fees $49,132 -
Natural Gas $1,526,362 170,163
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $135,839 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,436

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $62,424 $69,750 $(-2,123.0)
(-81,592)
kWh
$(-1,903.0)
-
kW-mo/yr
$66,450
-
MMBtu
02 2.3112: Store heated/ cooled water for use during peak demand periods $30,865 $25,000 - $30,865
-
kW-mo/yr
-
03 2.7444: Close holes and openings in building such as broken windows $12,963 $2,480 - - $12,963
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $12,296 $7,000 $6,880
264,428
kWh
$5,416
-
kW-mo/yr
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $9,136 $3,084 - - $9,136
-
MMBtu
06 2.7111: Reduce illumination to minimum necessary levels $4,473 $400 $4,473
171,924
kWh
- -
07 2.2414: Use waste heat from hot flue gases to preheat $2,953 $3,286 - - $2,953
-
MMBtu
08 2.2414: Use waste heat from hot flue gases to preheat $596 $660 $596
11,464
kWh
- -
09 2.7111: Reduce illumination to minimum necessary levels $133 $175 $133
5,107
kWh
- -
TOTAL RECOMMENDED $135,839 $111,835 $9,959
371,331
kWh
$34,378
-
kW-mo/yr
$91,502
-
MMBtu
TOTAL IMPLEMENTED $17,436 $2,880 $4,473
171,924
kWh
- $12,963
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs