Assessment Year | 1994 |
---|---|
Principal Product | Plastic Easter Eggs |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 236 |
Plant Area |
180,000
ft2
|
Annual Production | 120,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $283,006 | 5,386,577 |
kWh
|
$0.053 |
Natural Gas | $26,833 | 5,824 |
MMBtu
|
$4.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,128 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,010 | $34,827 | n/a |
$9,010
171,747
kWh
|
- |
02 | 2.7111: Reduce illumination to minimum necessary levels | $2,084 | $500 | n/a |
$2,084
39,566
kWh
|
- |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,547 | $23,800 | n/a |
$2,547
48,652
kWh
|
- |
04 | 2.3212: Optimize plant power factor | $21,315 | $21,000 | n/a |
$21,315
405,920
kWh
|
- |
05 | 2.4133: Use most efficient type of electric motors | $5,503 | $14,600 | n/a |
$5,503
104,924
kWh
|
- |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $388 | $1,211 | n/a |
$388
7,327
kWh
|
- |
07 | 2.4221: Install compressor air intakes in coolest locations | $736 | $350 | n/a |
$736
14,068
kWh
|
- |
08 | 2.6214: Shut off pilots in standby equipment | $371 | $140 | n/a | - |
$371
-
MMBtu
|
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,222 | $1,230 | n/a | - |
$2,222
-
MMBtu
|
10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,952 | $3,885 | n/a | - |
$1,952
-
MMBtu
|
TOTAL RECOMMENDED | $46,128 | $101,543 |
$41,583
792,204
kWh
|
$4,545
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs