ITAC Assessment: AT0121
ITAC logo
ITAC Assessment: AT0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product FIRE EXTINGUISHERS
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area
n/a
Annual Production 12,000,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $347,984 6,395,956
kWh
Natural Gas $177,256 45,084
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,578 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,516

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $52,560 $22,000 - $52,560
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $5,502 $10,000 - $5,502
-
MMBtu
03 2.7261: Install timers and/or thermostats $2,153 $1,500 $2,153
39,566
kWh
-
04 2.2135: Repair and eliminate steam leaks $13,451 $50 - $13,451
-
MMBtu
05 2.4133: Use most efficient type of electric motors $837 $616 $837
15,533
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,374 $300 $8,374
153,869
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $505 $500 $505
9,379
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,196 $1,080 $1,196
21,981
kWh
-
TOTAL RECOMMENDED $84,578 $36,046 $13,065
240,328
kWh
$71,513
-
MMBtu
TOTAL IMPLEMENTED $26,516 $4,046 $13,065
240,328
kWh
$13,451
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs