Assessment Year | 1989 |
---|---|
Principal Product | FIRE EXTINGUISHERS |
NAICS |
n/a
|
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 210 |
Plant Area |
n/a
|
Annual Production | 12,000,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $347,984 | 6,395,956 |
kWh
|
$0.054 |
Natural Gas | $177,256 | 45,084 |
MMBtu
|
$3.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $84,578 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,516 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $52,560 | $22,000 | - |
$52,560
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $5,502 | $10,000 | - |
$5,502
-
MMBtu
|
|
03 | 2.7261: Install timers and/or thermostats | $2,153 | $1,500 |
$2,153
39,566
kWh
|
- | |
04 | 2.2135: Repair and eliminate steam leaks | $13,451 | $50 | - |
$13,451
-
MMBtu
|
|
05 | 2.4133: Use most efficient type of electric motors | $837 | $616 |
$837
15,533
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,374 | $300 |
$8,374
153,869
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $505 | $500 |
$505
9,379
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,196 | $1,080 |
$1,196
21,981
kWh
|
- | |
TOTAL RECOMMENDED | $84,578 | $36,046 |
$13,065
240,328
kWh
|
$71,513
-
MMBtu
|
||
TOTAL IMPLEMENTED | $26,516 | $4,046 |
$13,065
240,328
kWh
|
$13,451
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs