ITAC Assessment: AT0114
ITAC logo
ITAC Assessment: AT0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product SYNETHETIC YARNS
NAICS
n/a
SIC 2282: Yarn Texturizing, Throwing, Twisting, and Winding Mills
Sales Range $10
M
to 50
M
# of Employees 268
Plant Area
n/a
Annual Production 24,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $685,027 15,818,289
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $120,034 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,476

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7261: Install timers and/or thermostats $9,606 $780 $9,606
221,864
kWh
02 2.7226: Use computer programs to optimize hvac performance $12,779 $16,500 $12,779
295,135
kWh
03 2.2437: Recover waste heat from equipment $14,813 $5,000 $14,813
342,028
kWh
04 2.4312: Improve lubrication practices $12,000 - $12,000
277,257
kWh
05 2.4133: Use most efficient type of electric motors $1,021 $1,150 $1,021
23,740
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,069 - $2,069
47,773
kWh
07 2.4221: Install compressor air intakes in coolest locations $14,139 $7,200 $14,139
326,495
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,877 $1,019 $4,877
112,544
kWh
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $48,730 $3,360 $48,730
1,125,440
kWh
TOTAL RECOMMENDED $120,034 $35,009 $120,034
2,772,276
kWh
TOTAL IMPLEMENTED $81,476 $22,029 $81,476
1,881,889
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs