ITAC Assessment: AS0578
ITAC logo
ITAC Assessment: AS0578
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Refrigerated produce
NAICS 493120: Refrigerated Warehousing and Storage
SIC 4222: Refrigerated Warehousing and Storage
Sales Range $1
M
to 5
M
# of Employees 17
Plant Area 80,000
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,769 1,033,871
kWh
Electricity Demand $20,072 3,066
kW-mo/yr
Electricity Fees $19,971 -
Waste Disposal Costs
Water Usage $3,092 5,053
Tgal
Water Disposal $3,926 5,685
Tgal
TOTAL YEARLY COSTS $152,830
RECOMMENDED SAVINGS* $4,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,471 $579 $294
2,877
kWh
$15
-
kW-mo/yr
- $1,162
02 2.7135: Install occupancy sensors $1,253 $1,182 $1,215
11,880
kWh
$38
-
kW-mo/yr
- -
03 2.8114: Change rate schedules or other changes in utility service $569 $810 - - $569 -
04 2.7226: Use computer programs to optimize hvac performance $258 $472 $258
2,527
kWh
- - -
05 2.7444: Close holes and openings in building such as broken windows $248 $187 $248
2,431
kWh
- - -
06 2.6231: Utilize controls to operate equipment only when needed $194 $162 $194
1,892
kWh
- - -
07 2.7272: Install heat pipes / raise cooling setpoint $137 $22 $137
1,341
kWh
- - -
TOTAL RECOMMENDED $4,130 $3,414 $2,346
22,948
kWh
$53
-
kW-mo/yr
$569 $1,162
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs