ITAC Assessment: AS0577
ITAC logo
ITAC Assessment: AS0577
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Canned foods
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 512,378
ft2
Annual Production 7,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $791,943 12,224,268
kWh
Electricity Demand $544,587 28,614
kW-mo/yr
Electricity Fees $283,135 -
Natural Gas $1,232,702 400,793
MMBtu
Waste Disposal Costs
Water Usage $605,855 98,285
Tgal
Water Disposal $800,388 70,809
Tgal
TOTAL YEARLY COSTS $4,258,610
RECOMMENDED SAVINGS* $549,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $242,289 $2,885,843 $213,386
3,292,993
kWh
$28,903
-
kW-mo/yr
- -
02 2.6231: Utilize controls to operate equipment only when needed $165,792 $921,043 $118,820
1,833,640
kWh
$46,972
-
kW-mo/yr
- -
03 2.2414: Use waste heat from hot flue gases to preheat $51,679 $30,000 - - $51,679
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $43,824 $34,114 $25,905
399,782
kWh
$10,249
-
kW-mo/yr
- $7,670
05 2.4224: Upgrade controls on compressors $20,991 $20,000 $15,042
232,128
kWh
$5,949
-
kW-mo/yr
- -
06 4.611: Begin a practice of predictive / preventative maintenance $14,086 $15,866 $14,086
217,377
kWh
- - -
07 2.7226: Use computer programs to optimize hvac performance $9,172 $2,798 $6,573
101,439
kWh
$2,599
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $1,281 $406 $920
14,199
kWh
$361
-
kW-mo/yr
- -
09 2.7132: Install timers on light switches in little used areas $388 $1,579 $278
4,294
kWh
$110
-
kW-mo/yr
- -
TOTAL RECOMMENDED $549,502 $3,911,649 $395,010
6,095,852
kWh
$95,143
-
kW-mo/yr
$51,679
-
MMBtu
$7,670
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs