ITAC Assessment: AS0517
ITAC logo
ITAC Assessment: AS0517
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Aerospace components
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 243,000
ft2
Annual Production 11,500
units
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $529,992 7,326,400
kWh
Electricity Demand $77,418 15,096
kW-mo/yr
Electricity Fees $14,836 -
TOTAL YEARLY COSTS $622,246
RECOMMENDED SAVINGS* $84,126 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,298

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $47,690 $126,497 $44,451
614,808
kWh
$3,239
-
kW-mo/yr
- -
02 2.1321: Replace fossil fuel equipment with electrical equipment $11,446 $48,382 $(-1,260.0)
(-17,422)
kWh
- $12,706
-
gal
-
03 2.2515: Use optimum thickness insulation $10,522 $15,516 $8,916
123,335
kWh
$1,606
-
kW-mo/yr
- -
04 2.4226: Use / purchase optimum sized compressor $8,331 $39,600 $7,593
105,026
kWh
$738
-
kW-mo/yr
- -
05 2.6231: Utilize controls to operate equipment only when needed $2,692 $2,880 $2,462
34,055
kWh
$230
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,189 $859 $1,986
27,472
kWh
$115
-
kW-mo/yr
- $88
07 2.4221: Install compressor air intakes in coolest locations $1,256 $1,541 $1,145
15,841
kWh
$111
-
kW-mo/yr
- -
TOTAL RECOMMENDED $84,126 $235,275 $65,293
903,115
kWh
$6,039
-
kW-mo/yr
$12,706
-
gal
$88
TOTAL IMPLEMENTED $22,298 $57,516 $19,640
271,674
kWh
$2,570
-
kW-mo/yr
- $88
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs