ITAC Assessment: AS0510
ITAC logo
ITAC Assessment: AS0510
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Door Hardware
NAICS 332510: Hardware Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 130
Plant Area 134,000
ft2
Annual Production 750,000
units
Production Hrs. Annual 2,567
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,524 2,774,160
kWh
Electricity Demand $33,563 6,696
kW-mo/yr
Electricity Fees $8,001 -
Waste Disposal Costs
Water Usage $19,288 2,825
Tgal
Water Disposal $7,091 2,599
Tgal
TOTAL YEARLY COSTS $276,467
RECOMMENDED SAVINGS* $64,463 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,691

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $18,281 $200 $22,457
-
kWh
$(-4,721.0)
-
kW-mo/yr
$545 - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,025 $18,448 $11,167
148,891
kWh
$2,644
-
kW-mo/yr
- - $214
03 2.7144: Install spectral reflectors / delamp $13,978 $9,244 $13,380
178,397
kWh
$263
-
kW-mo/yr
- - $335
04 3.5316: Contract a wood pallet recycling company $7,800 $453 - - - $7,800 -
05 2.7272: Install heat pipes / raise cooling setpoint $6,879 $560 $5,677
75,496
kWh
$1,202
-
kW-mo/yr
- - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,097 $447 $146
1,946
kWh
$1,951
-
kW-mo/yr
- - -
07 2.4224: Upgrade controls on compressors $713 $3,359 $653
8,713
kWh
$60
-
kW-mo/yr
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $690 $40 $632
8,423
kWh
$58
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $64,463 $32,751 $54,112
421,866
kWh
$1,457
-
kW-mo/yr
$545 $7,800 $549
TOTAL IMPLEMENTED $14,691 $12,603 $14,033
187,110
kWh
$323
-
kW-mo/yr
- - $335
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs