Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Chemicals and Chemical Preparations
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 8,820
ft2
Annual Production 13,215,390
lb
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $298,975 5,128,303
kWh
Electricity Demand $75,529 8,914
kW-mo/yr
Electricity Fees $15,915 -
TOTAL YEARLY COSTS $390,419
RECOMMENDED SAVINGS* $51,892 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $675

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,774 $11,876 $15,346
263,252
kWh
$3,428
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,308 $21,823 $9,512
163,165
kWh
$2,296
-
kW-mo/yr
$500
03 2.4133: Use most efficient type of electric motors $6,899 $28,466 $5,819
99,816
kWh
$1,080
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $6,004 $7,027 $6,004
102,980
kWh
- -
05 2.7423: Reduce heat gain by window tinting $5,105 $19,291 $2,798
48,000
kWh
$2,307
-
kW-mo/yr
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,216 $30 $631
10,820
kWh
$585
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $805 $135 $686
11,763
kWh
$119
-
kW-mo/yr
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $675 $122 $572
9,811
kWh
$103
-
kW-mo/yr
-
09 2.4224: Upgrade controls on compressors $106 $394 $90
1,542
kWh
$16
-
kW-mo/yr
-
TOTAL RECOMMENDED $51,892 $89,164 $41,458
711,149
kWh
$9,934
-
kW-mo/yr
$500
TOTAL IMPLEMENTED $675 $122 $572
9,811
kWh
$103
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs