ITAC Assessment: AS0444
ITAC logo
ITAC Assessment: AS0444
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Ceramic dinnerware
NAICS 327110: Pottery, Ceramics, and Plumbing Fixture Manufacturing
SIC 3262: Vitreous China Table and Kitchen Articles
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 100,000
ft2
Annual Production 428,500
units
Production Hrs. Annual 2,295
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,581 608,400
kWh
Electricity Fees $317 -
Natural Gas $84,976 12,084
MMBtu
Waste Disposal Costs
Water Usage $8,299 885
Tgal
TOTAL YEARLY COSTS $179,174
RECOMMENDED SAVINGS* $43,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4224: Upgrade controls on compressors $33,358 $4,325 $33,358
236,581
kWh
02 2.7447: Install vinyl strip / high speed / air curtain doors $6,643 $872 $6,643
47,186
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,007 $100 $2,007
14,234
kWh
04 2.7145: Install skylights $1,596 $1,633 $1,596
11,314
kWh
TOTAL RECOMMENDED $43,604 $6,930 $43,604
309,315
kWh
TOTAL IMPLEMENTED $8,650 $972 $8,650
61,420
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs