ITAC Assessment: OR0349
ITAC logo
ITAC Assessment: OR0349
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Particle Board
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 64
Plant Area 96,570
ft2
Annual Production 70,135
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $403,458 15,606,096
kWh
Electricity Demand $66,000 314,652
kW-mo/yr
Electricity Fees $(-2,622.0) -
Natural Gas $12,868 3,534
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $313,459 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,343

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $40,560 $64,125 $40,560
1,568,875
kWh
- - -
02 4.652: Replace existing equipment with more suitable substitutes $36,220 $98,500 $5,840
225,674
kWh
$2,300 $22,000 $6,080
03 2.4325: Upgrade conveyors $18,725 $46,000 $18,725
724,209
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,088 $10,000 $13,088
506,155
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,171 - $1,171
45,428
kWh
- - -
06 2.4224: Upgrade controls on compressors $24,695 $2,840 $24,695
955,158
kWh
- - -
07 3.2176: Increase use of automation $179,000 $42,000 - $179,000 - -
TOTAL RECOMMENDED $313,459 $263,465 $104,079
4,025,499
kWh
$181,300 $22,000 $6,080
TOTAL IMPLEMENTED $78,343 $76,965 $78,343
3,030,188
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs