| Assessment Year | 2006 |
|---|---|
| Principal Product | Helicopters |
| NAICS | 336411: Aircraft Manufacturing |
| SIC | 3721: Aircraft |
| Sales Range | $100 M to 500M |
| # of Employees | 185 |
| Plant Area |
2,000,000
ft2
|
| Annual Production | 6
pieces
|
| Production Hrs. Annual | 2,016
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $144,204 | 2,383,680 |
kWh
|
$0.060 |
| Electricity Demand | $30,408 | 19,845 |
kW-mo/yr
|
$1.53 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,301 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,968 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $31,751 | $36,000 |
$31,751
437,955
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,872 | $34,827 |
$3,525
48,622
kWh
|
$347
-
kW-mo/yr
|
- | |
| 03 | 4.821: Pay bills on time to avoid late fees | $3,096 | - | - | - | $3,096 | |
| 04 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $1,237 | - |
$1,237
12,480
kWh
|
- | - | |
| 05 | 2.9112: Use solar heat to heat water | $345 | $2,050 |
$343
4,801
kWh
|
$2
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $40,301 | $72,877 |
$36,856
503,858
kWh
|
$349
-
kW-mo/yr
|
$3,096 | ||
| TOTAL IMPLEMENTED | $6,968 | $34,827 |
$3,525
48,622
kWh
|
$347
-
kW-mo/yr
|
$3,096 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs