ITAC Assessment: AS0416
ITAC logo
ITAC Assessment: AS0416
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Helicopters
NAICS 336411: Aircraft Manufacturing
SIC 3721: Aircraft
Sales Range $100
M
to 500
M
# of Employees 185
Plant Area 2,000,000
ft2
Annual Production 6
pieces
Production Hrs. Annual 2,016
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,204 2,383,680
kWh
Electricity Demand $30,408 19,845
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,968

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $31,751 $36,000 $31,751
437,955
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,872 $34,827 $3,525
48,622
kWh
$347
-
kW-mo/yr
-
03 4.821: Pay bills on time to avoid late fees $3,096 - - - $3,096
04 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $1,237 - $1,237
12,480
kWh
- -
05 2.9112: Use solar heat to heat water $345 $2,050 $343
4,801
kWh
$2
-
kW-mo/yr
-
TOTAL RECOMMENDED $40,301 $72,877 $36,856
503,858
kWh
$349
-
kW-mo/yr
$3,096
TOTAL IMPLEMENTED $6,968 $34,827 $3,525
48,622
kWh
$347
-
kW-mo/yr
$3,096
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs