ITAC Assessment: AS0405
ITAC logo
ITAC Assessment: AS0405
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Aircraft components
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 100,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 5,907
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $292,616 4,616,227
kWh
Natural Gas $22,115 2,233
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,338 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $20,884 $119,908 $20,884
290,060
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $8,903 $1,000 $8,903
124,522
kWh
03 2.4224: Upgrade controls on compressors $7,610 $11,000 $7,610
106,440
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,782 $4,000 $5,782
80,867
kWh
05 2.6231: Utilize controls to operate equipment only when needed $5,719 $120 $5,719
79,424
kWh
06 2.4226: Use / purchase optimum sized compressor $867 $3,000 $867
12,125
kWh
07 2.4133: Use most efficient type of electric motors $573 $612 $573
31,827
kWh
TOTAL RECOMMENDED $50,338 $139,640 $50,338
725,265
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs