ITAC Assessment: OR0595
ITAC logo
ITAC Assessment: OR0595
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Municipal Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area 173,000
ft2
Annual Production 1,900
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,403 2,153,760
kWh
Electricity Demand $35,086 4,611
kW-mo/yr
Fuel Oil #2 $11,515 441
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,355 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,146

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4131: Size electric motors for peak operating efficiency $13,800 $8,370 $12,000
162,909
kWh
$1,800
-
kW-mo/yr
- -
02 3.4141: Replace the chlorination stage with an oxygen or ozone stage $39,919 $200,000 $(-10,484.0)
(-147,168)
kWh
$(-1,597.0)
-
kW-mo/yr
$(-6,000.0) $58,000
03 2.4311: Recover mechanical energy $1,034 $780 $1,034
12,598
kWh
- - -
04 2.2437: Recover waste heat from equipment $9,290 $9,500 $9,290
130,400
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,312 $4,888 $1,139
15,987
kWh
$173
-
kW-mo/yr
- -
TOTAL RECOMMENDED $65,355 $223,538 $12,979
174,726
kWh
$376
-
kW-mo/yr
$(-6,000.0) $58,000
TOTAL IMPLEMENTED $16,146 $14,038 $14,173
191,494
kWh
$1,973
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs