ITAC Assessment: SU0410
ITAC logo
ITAC Assessment: SU0410
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Bottled Water
NAICS 312112: Bottled Water Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $1
M
to 5
M
# of Employees 49
Plant Area 150,000
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $373,418 6,671,949
kWh
Electricity Demand $195,271 21,470
kW-mo/yr
Electricity Fees $46,649 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,297 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $89,308

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $20,079 - - - - $20,079
02 4.821: Pay bills on time to avoid late fees $10,482 - - - - $10,482
03 2.4231: Reduce the pressure of compressed air to the minimum required $9,089 - $9,089
162,220
kWh
- - -
04 2.7122: Disconnect ballasts $2,567 - $1,957
34,944
kWh
$610
-
kW-mo/yr
- -
05 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $12,472 $1,075 $12,472
222,717
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $4,989 $6,191 $4,989
89,087
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $13,702 $18,890 $8,247
147,264
kWh
$2,574
-
kW-mo/yr
$1,680 $1,201
08 2.7142: Utilize higher efficiency lamps and/or ballasts $20,321 $35,838 $15,480
276,432
kWh
$4,841
-
kW-mo/yr
- -
09 2.6211: Conserve energy by efficient use of vending machines $145 $265 $145
2,581
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $451 $956 $226
4,029
kWh
$50
-
kW-mo/yr
$102 $73
TOTAL RECOMMENDED $94,297 $63,215 $52,605
939,274
kWh
$8,075
-
kW-mo/yr
$1,782 $31,835
TOTAL IMPLEMENTED $89,308 $57,024 $47,616
850,187
kWh
$8,075
-
kW-mo/yr
$1,782 $31,835
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs