ITAC Assessment: AS0271
ITAC logo
ITAC Assessment: AS0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Evaporative Coolers
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 200,000
ft2
Annual Production 65,000
pieces
Production Hrs. Annual 2,100
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,285 2,002,638
kWh
Electricity Demand $22,664 8,482
kW-mo/yr
Electricity Fees $12,995 -
Natural Gas $111,937 17,238
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,005 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,872

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,637 $1,266 $1,637
29,015
kWh
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $708 $607 $433
7,620
kWh
$53
-
kW-mo/yr
$122 - $100 -
03 2.7261: Install timers and/or thermostats $591 $600 $591
10,551
kWh
- - - - -
04 2.4226: Use / purchase optimum sized compressor $10,502 $30,380 $6,594
116,940
kWh
$3,908
-
kW-mo/yr
- - - -
05 2.6125: Keep equipment clean $3,601 $232 $2,261
40,152
kWh
$1,340
-
kW-mo/yr
- - - -
06 3.6192: Use a less expensive method of waste removal $795 $120 - - - $795 - -
07 3.6192: Use a less expensive method of waste removal $403 $60 - - - $403 - -
08 4.812: Apply for investment incentives $1,640 $60 - - - $1,640 - -
09 3.5316: Contract a wood pallet recycling company $10,128 $120 - - - - - $10,128
TOTAL RECOMMENDED $30,005 $33,445 $11,516
204,278
kWh
$5,301
-
kW-mo/yr
$122 $2,838 $100 $10,128
TOTAL IMPLEMENTED $16,872 $1,139 $2,694
47,772
kWh
$1,393
-
kW-mo/yr
$122 $2,435 $100 $10,128
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs